Plant Overview
|
Glow Phase 2 Central Utilities Cogeneration Plant was developed by Glow Energy Public Co., Ltd. This plant, which became fully operation in October 1996, employed a combined cycle cogeneration process for the purpose of utilizing natural gas (or diesel). This plant supplies electricity through a dedicated underground cable connection to industrial customers. Steam and water distribution systems directly supply with both high and medium pressure steams. Besides the industrial customers, the plant also supplies 180 MW of electricity to EGAT under Small Power Producer (SPP) program.
In addition, this plant also connects its electricity transmission system to Glow Phase 3&4 Hybrid Cogeneration Plant to strengthen overall transmission system reliability. |
Plant Information
|
Contact
|
| Glow Phase 2 – Central Utilities Cogeneration Plant |
| By Glow Energy Public Company Limited |
| Location |
: Map Ta Phut Industrial Estate, Rayong |
| Production capacity |
: Power 281 MW, Steam 300 t/hr, Clarified
water 900 cu.m./hr, Demineralized
water 280 cu.m./hr |
| Commercial Operation Date |
: October 1996 |
| Type of fuel |
: Natural gas and diesel |
 |
|
|