Business Lines
Glow Energy Phase 1 N12.693739, E101.144439 GPS Location: 

 


Glow Phase 1 Central Utilities Plant, which began commercial operation in July 1994 by Glow Energy Public Co., Ltd., involves the operation of water and steam. The plant utilizes natural gas as primary fuel. Because this facility uses relatively inefficient boilers for steam generation, we do not enter into long-term steam supply contracts with respect to this facility, but rather use it to satisfy short-term demand, start-up demand and excess capacity and to strengthen our overall system reliability.

Plant Information
  • Name: Glow Energy Phase 1 Plant
  • Location: Map Ta Phut Industrial Estate, Rayong
  • Production Capacity: Steam 250 t/hr, Clarified water 1,110 cu.m./hr, Demineralized water 230 cu.m./hr
  • Commercial Operation Date: July 1994
  • Type of fuel: Natural gas
  • Tel: (66 38) 684 078-80
  • Fax: (66 38) 684 061